Project Locations |
|
Development Region |
Eastern Development Region |
Intake Site |
Bhorleni, Barbote |
Powerhouse Site |
Narayanthan Khola, Ilam Municipality |
Geographical Co-ordinates: |
|
Latitude |
26° 55′ 41″ N – 26° 56′ 27″ N |
ongitude |
87° 56’ 34” E – 87° 57’ 15” E |
General |
|
Name of River |
Mai Khola |
Nearest Town |
Barbote |
Gross Head |
46.845 m |
Net rated Head |
44.217 m |
Installed Capacity |
3.0 MW |
Average Annual Energy after Outage |
18.30 GWh, Dry Energy 3.26 GWh and Wet |
|
Energy 15.04 GWh |
Hydrology |
|
Mean Annual Discharge |
.08 m³/sec |
Design Discharge |
7.5 m³/sec |
Riparian Release |
0.235 m³/sec |
Average Annual Precipitation |
2,000 mm Approaching Canal |
Rectangular Closed Canal |
2.60m * 2.00m (148m Long) |
Headpond |
|
Type |
Rectangular |
Nos. of bay |
1 |
T Dimension (L x B x H) ype |
30 m * 8m * 4.25 -6.0m |
Penstock Pipe |
|
Type |
Mild Steel |
Internal Diameter |
2.1, 2.0 and 1.9 |
Length |
1504 m |
Steel Thickness |
6 to 8 mm |
Nos. of Anchor Blocks |
22 |
Nos. of Saddle Supports |
22 |
Powerhouse |
|
Type |
Surface |
Size (L x W) |
25.00 m * 13.25 m |
Height |
16.35 m |
Turbine Axis Level |
646.00 amsl Tailrace |
Type |
Concrete, Box canal |
Tailrace Length |
93 m |
Size (W x D) ht |
2.00 * 1.50 m |
Tailrace Water Level t |
643.50 amsl |
Turbine |
|
Type |
Horizontal Francis |
Number |
2 |
Rated Output Capacity per unit |
1.5 MW |
Tail water level |
643.5 amsl |
Net Head |
44.217m |
Discharge per Unit |
3.665 m³/sec. |
Efficiency |
92.00 % |
Governor |
|
Type |
Electronic with PID flow Adjustment |
Adjustment for Speed Drop |
Between 0 to 5% |
Generator |
|
Type |
Synchronous, Three phase |
Rated Output Capacity per Unit |
1.715 MVA |
Power Factor |
0.85 |
Voltage |
6.6kV |
Frequency |
50 Hz |
No of Units |
2 |
Excitation System |
Brushless |
Efficiency |
97.00 % |
Transformer |
|
Type |
Three Phase, Oil Immersed, Outdoor |
Rated Capacity |
3.78 MVA |
Voltage Ratio |
33/6.6 kV |
No of Units /td>
| 1 |
Vector Group |
Ynd11 |
Efficiency |
99.00 % |
Transmission Line |
|
Voltage Level |
11 KV |
Length |
2 Km Approx. |
Conductor Type |
Dog |
From |
Powerhouse |
To |
Super Mai HPP 7.8MW Powerhouse Switchyard |
Project Cost Estimate |
|
Total Cost of the Project |
NRs 556,299,788.70 |
Construction Period |
2.0 years |